地铁盾构法隧道工程建设风险识别与应对 被引量:36

Risk Identification and Handling in Construction of Metro Shield Tunnel Project
下载PDF
导出
摘要 结合上海地铁7号线工程,提出以动态风险识别过程为主线,以静态风险识别为手段的风险识别方法,对地铁盾构法隧道工程建设的风险进行了识别。在风险识别的基础上,结合以往软土隧道工程建设的实践经验、数据资料以及隧道工程理论,重点研究了盾构法隧道工程实施过程中一些典型风险的应对措施。另外,对跨越黄浦江段隧道、联络通道等特殊工程的风险进行了详细地分析与研究。 Based on Shanghai metro M7 line project, the risk identification method is presented, taking dynamic risk identification process as the mainstream and static risk identification as a tool. The risk in construction of metro shield tunnel project is identfied with the method above mentioned. On the base of risk identification, the risk handling measurements about some typical risk in construction of metro shield tunnel is studied in accordance with practical experiences , colleeted data and literatures from previous similar tunnel project in soft soil and tunnel theory. In addition, the risk in the tunnel across Huangpu River tunnel and communication channels between the upline and downline tunnel is analyzed particularly.
出处 《地下空间与工程学报》 CSCD 2006年第3期475-479,共5页 Chinese Journal of Underground Space and Engineering
基金 上海建筑科学研究院科研创新基金资助项目
关键词 地铁建设 盾构法隧道 风险识别 风险应对措施 metro construction shield tunnel risk identification risk handling measurement
  • 相关文献

参考文献8

  • 1Einstein,H.H..Risk and risk analysis in rock engineering[J].Tunnelling and Underground Space Technology,1996,11(2):141~155
  • 2Sturk,R.,Olsson,L.and Johansson,J..Risk and decision analysis for large underground projects,as applied to the Stockholm ring road tuning[J].Tunnelling and Underground Space Technology,1996,11(2):157~164
  • 3Vik,E.A.,Sverdrup,L.,Kelley,A.etc.Experiences from environmental risk management of chemical grouting agents used during construction of the Romeriksporten tunnel[J].Tunnelling and Underground Space Technology,2000,15(4):369~378
  • 4Tonon,F.,Mammino,A.,Bernardini,A..Multiobjective optimization under uncertainty in tunneling:application to the design of tunnel support/reinforcement with case histories[J].Tunnelling and Underground Space Technology,2002,17:33~54
  • 5Yoo,C.,Kim,J.H..A web-based tunneling-induced building/utility damages assessment system:TURISK[J].Tunnelling and Underground Space Technology,2003,18:497~511
  • 6Eskesen,S.D.,Tengborg,P.,Kampann,J.,etc.Guidelines for tunnelling risk management:International Tunnelling Association,Working Group No.2[J].Tunnelling and Underground Space Technology,2004,19:217~237
  • 7郭仲伟.风险分析与决策[M].北京:机械工业出版社,1986..
  • 8石礼安.地铁一号线工程[M].上海:上海科学技术出版社,1998.

共引文献34

同被引文献256

引证文献36

二级引证文献432

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部