摘要
基于湖南省湘江大源渡航电枢纽机电设备管理的经验,探讨水电、航电枢纽工程设备从设计、制造、安装到运行、维护实施全过程管理的意义及方法。
According to the experience of electromechanical equipment management of Dayuandu Navigation-Power Junction on Xiangjiang River of Hunan Province, this paper probes into the significance and methods of whole-process management of hydropower & navigation and power generation junctions from design, manufacture and installation to operation and maintenance.
出处
《水运工程》
北大核心
2006年第6期67-70,共4页
Port & Waterway Engineering
关键词
航电枢纽
设备
全过程管理
navigation-power junction
equipment
whole-process management