对集装箱码头装卸桥后轨灌注桩施工准备阶段、成孔过程、钢筋笼制作与安装、灌注水下混凝土等施工监理质量控制及检测方法进行分析,并提出了保证灌注桩施工质量的监控措施。
This container gantry crane period, and underwater paper analyzes the supervision quality control of and inspection method for quayside rear- rack bored concrete pile construction during construction preparation period, boring concrete casting, and proposes monitoring measures ensuring construction quality of bored concrete piles.
出处
《水运工程》
北大核心
2006年第6期89-92,共4页
Port & Waterway Engineering
关键词
灌注桩
质量控制
质量检测
bored concrete pile
quality control
inspection