摘要
文章介绍了干负载处理的实验装置、实验方法和在真空中除气时残余气体谱图分析。通过谱图分析,确定了干负载在安装到电子直线加速器上之前,应进行哪些处理。
The article give a minute description of experiment installation, method for treatments ofdryload and residual gases spectroscopy analysis during its vacuum outgassing. By spectroscopyanalysis, treatment procedures of the dryload installing on LINAC are decided.
出处
《原子能科学技术》
EI
CAS
CSCD
北大核心
1996年第4期355-360,共6页
Atomic Energy Science and Technology