期刊文献+

软土地区工程性地面沉降预测的非等时距GM(1,1)模型 被引量:19

AN UNEQUAL TIME-INTERVAL GM(1,1) MODEL FOR PREDICTING GROUND SETTLEMENT IN SHANGHAI SOFT SOIL ENGINEERING
下载PDF
导出
摘要 大规模城市建设诱发的工程性地面沉降已成为上海软土地区地面沉降新的制约因素。本文针对上海地区工程性地面沉降特点,运用灰色理论建立了非等时距GM(1,1)预测模型,并用工程实测数据进行检验,得到令人满意的预测结果。研究结果对预测和控制软土地区由建筑物群引起的地面沉降具有重要意义。 The ground settlement caused by large - scale urban construction has become a new restriction factor of ground settlement in soft soil area of Shanghai. An unequal time - interval GM (1,1) predicting grey model is established according to the characteristics of ground settlement in soft soil area. The model is proved to be satisfying through the examination of engineering practice, and is of significant importance for the prediction and control of ground settlement, induced by engineering construction.
出处 《工程地质学报》 CSCD 2006年第3期398-400,共3页 Journal of Engineering Geology
基金 国土资源部 上海市人民政府合作项目"上海市三维城市地质调查"(No.基[2004]011-02)资助 上海市重点学科建设基金资助项目
关键词 软土 工程性地面沉降 非等时距GM(1 1)模型 Soft soil, Ground settlement induced by engineering, Unequal time - interval GM (1,1) model, Shanghai
  • 相关文献

参考文献7

二级参考文献19

  • 1廖野澜,谢谟文.监测位移的灰色预报[J].岩石力学与工程学报,1996,15(3):269-274. 被引量:36
  • 2钟耳顺 宋关福.GIS组件化与组件式GIS研究.中国地理信息系统协会1998年年会资料[M].北京,1998..
  • 3施健勇.汽车专用公路现场试验分析.第七届土力学及基础工程学术会议论文集[M].北京:中国建筑工业出版社,1994..
  • 4郑大同 孙更生.软土地基与地下工程[M].北京:中国建筑工业出版社,1984..
  • 5施健勇,第七届土力学及基础工程学术会议论文集,1994年
  • 6傅立,灰色系统理论及其应用,1992年
  • 7陈希哲,土力学地基基础,1998年,112页
  • 8彭振斌,地基处理工程设计计算与施工,1997年,112页
  • 9易德生,灰色理论与方法,1992年,134页
  • 10邓聚龙,灰色预测与决策,1992年,101页

共引文献255

同被引文献131

引证文献19

二级引证文献85

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部