期刊文献+

水利水电工程施工地质中编录测绘成图方法综述 被引量:4

General Depiction of the Methods of Recording, Plotting and Mapping in Construction Geology of Water Conservancy Projects
下载PDF
导出
摘要 地质编录与测绘是重要水利水电工程施工地质工作的一项主要内容,一般地质编录测绘需要完成工程地质图图幅。文中以岩质水平建基面为例,介绍了工程地质平面图图幅的编录测绘成图方法和利用不同方法测绘的各类初始数据进行矢量化计算机成图的方法。 Geological recording and plotting is one of the main tasks in the construction geology of water conservancy projects. General geological recording and plotting requires the completion of geological sheet. Methods of recording and mapping of ichnography of engineering geology and methods of making the vector and computer mapping of various initial data surveyed in different ways are introduced, horizontal base level of rock being taken as an examole.
出处 《长江工程职业技术学院学报》 CAS 2006年第1期21-23,共3页 Journal of Changjiang Institute of Technology
关键词 岩质水平建基面 编录测绘 成图 矢量化 施工地质 horizontal base level of rock recording and plotting mapping vector construction geology
  • 相关文献

参考文献1

  • 1DL/T 5109-1999.水电水利工程施工地质规程[S],2000.

同被引文献9

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部