景洪电站高气温条件下大坝碾压混凝土连续施工研究 被引量:5

Study on continuous construction of Jinghong hydropower station RCC dam in high temperature
下载PDF
导出
摘要 景洪电站地处亚热带,高气温时间长,大坝碾压混凝土施工温控难度高。本文通过对原材料及配合比、混凝土出机口温度控制、运输过程温度控制、浇筑过程的温度控制以及混凝土浇筑后的养护和冷却通水等一系列研究,提出景洪电站高气温条件下大坝碾压混凝土连续施工的综合措施,并在计算和已有经验的基础上给出具体实施方法。 Jinghong hydropower station RCC dam is in the subtropics zone, the high temperature continues very long and the temperature control in dam construction is very difficult. By the research on the raw materials, the mix proportion, the concrete temperature control in outlet, in transport and in placement, the cure and the pest-cooling water, the synthetic measures for RCC dam construction in high temperature and the enforcement methods on basis of the computation and experience of Jinghong hydropower station are presented in this paper.
出处 《水力发电学报》 EI CSCD 北大核心 2006年第3期91-96,共6页 Journal of Hydroelectric Engineering
基金 三峡大学开设基金(HEF200403)
关键词 水工结构 连续施工 温度控制 碾压混凝土坝 景洪电站 hydraulic structure continuous construction temperature control RCC dam Jinghong hydropower station
  • 相关文献

参考文献3

  • 1《三峡水利枢纽混凝土温度控制研究》编辑委员会.三峡水利枢纽混凝土温度控制研究[M].北京:中国水利水电出版社,2001:317~356.
  • 2《水利水电工程施工组织设计手册》编辑委员会.水利水电工程施工组织设计手册.第三卷--混凝土工程[M].北京:中国水利电力出版社,2002:126~143.
  • 3梁润.施工技术[M].北京:水利水电出版社,1994年第四版:384.

共引文献1

同被引文献23

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部