围涂工程规划中防洪除涝问题的研究 被引量:2

Study on flood control and waterlogged elimination problems on reclamation engineering
下载PDF
导出
摘要 围涂工程的防洪除涝包括流域内上游各防护对象和围区两个方面。要解决好围涂工程中的防洪除涝问题,必须做好全流域范围内的防洪除涝规划和围区规划工作,计算、分析并确定水闸规模,最后提出合理可行的水闸运用方式。本文以在我国东南沿海地区具有一定代表性的浙江省温州市乐清胜利塘北片围涂工程为对象,采用平原河网非恒定流等水利计算方法,以研究围涂工程规划中的防洪除涝问题。 The flood control and waterlogged elimination includes two aspects: the objects are all defended in the basin and reclaimed area. It is necessary to plan flood control and waterlogged elimination, calculate and analyse the size of water gate, as well as to bring forward the reasonable and feasible running way. A representative example of reclamation engineering is located in Yueqing(Wenzhou, Zhejiang) which is cited to illustrate the way of resolving these problems.
作者 潘桂娥
机构地区 浙江大学
出处 《水力发电学报》 EI CSCD 北大核心 2006年第3期97-101,共5页 Journal of Hydroelectric Engineering
关键词 围涂工程 规划 防洪除涝 水闸 排水 reclamation engineering plan flood control and waterlogged elimination water gate drain
  • 相关文献

参考文献4

  • 1(SL201-97).《江河流域规划编制规范》.中华人民共和国水利部,1~30.
  • 2《工程建设标准强制性条文(水利工程部分)》.水利部国际合作与科技司,69~87.
  • 3《水利技术标准汇编-水利水电卷(规划)》.水利部国际合作与科技司,47~48.
  • 4《浙江省海塘工程技术规定(下册)》.浙江省水利厅,3~4.

同被引文献8

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部