摘要
广西玉林市城北自来水厂输水工程设计,在不同设计阶段,对各个设计方案进行优化比选,实现了优化设计与施工,节省投资503万元,达到了预期的目标。工程竣工投产后,效益显著。
At different design stages of the water transmission project for Chengbei Waterworks in Yulin City of Guangxi, optimization and comparison of many design schemes were made before the optimum design and construction scheme was determined, rendering a cost saving of RMB 5.03 million yuan while the expected objective is achieved. The completed and operating project has brought significant benefit.
出处
《广西水利水电》
2006年第2期33-35,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
自来水厂
输水工程
设计
优化
Waterworks
water transmission project
design
optimization