摘要
通过洪家渡水电站的天生桥料场锚固工程,比较分析试验锚索测力计与油表读数关系,同时对测力计与千斤顶油表进行标定,对两系统的误差原因进行试验分析,为锚索的张拉提供更准确、更合理的施工参数。
At the anchoring project of Tianshengqiao construction material yard for Hongjiadu Hydropower Plant, the readings from anchorage rope dynamometer and oil gauge were compared and analyzed; the dynamometer and jack oil gauge were calibrated at the same time; test and analysis were conducted to clarify the reasons for error of two systems, so that more accurate and more rational construction data is available for thestretching of anchorage rope.
出处
《广西水利水电》
2006年第2期46-48,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
洪家渡水电站
预应力锚索
高边坡锚固
误差分析
Hongjiadu Hydropower Plant
pre-stressed anchorage rope
high bank slope anchoring
error analysis