摘要
本文针对CMM模型中涉及很少的软件开发进度规划问题进行研究,提出一种分阶段并行开发模型,并用数学方法进行描述,最后通过对该模型的每个阶段内部进行优化,使影响整体项目开发效率的因素,分解到每个阶段调节模型的具体参数上,最终达到提高整体项目开发效率的目的。
Due to less research in software schedule schema in CMM model, the parallel phase model is introduced in this paper. This model, through mathematic methods, aims to lielp improve the efficiency of the overall project development by optimizing each phase and breaking down the factors affecting the efficiency of the overall software development into concrete adjusting parameters of each phase.