大直径灌注桩施工质量能否达到规范及设计要求直接关系到建筑物本身安全及安全运行,检验施工质量最行之有效的方法之一就是采用静载荷试验法,大吨位静载荷试验在实施中具有一定难度,现结合漕河渡槽桩基础检测进行探讨,供同行参考。
One of the most effective methods of construction quality check for pile foundation is a static load test. Large tonnage static load test has certain difficulty in the practical implementation. This text discusses what we have done in the pile foundation check of Caohe River aqueduct for counterpart's reference.