输水隧洞近接沉箱桩施工的三维有限元分析 被引量:1

3-D FEM analysis of constructing tunnels adjacent to existing caisson pile
下载PDF
导出
摘要 使用基于弹塑性增量理论的三维有限元方法,较细致地模拟了公路下输水隧洞近接沉箱桩施工的过程,并考虑了混凝土和注浆地层力学参数随龄期的变化,得出了一系列对设计和施工具有重要参考意义的结论。本文的研究对于类似接近桩基的暗涵工程,具有一定参考价值。 In this paper, the tunnels construction adjacent to existing pile foundation is studied. Two water diversion tunnels are embedded in soft soil under road.The construction process of tunnels adjacent to caisson piles is simulated with the 3 - D nonlinear finite element method in details, considering the materials properties change by time. The conclusions and suggestions are valuable for the engineering design,and worthful as references for the similar projects.
出处 《河北建筑科技学院学报》 2006年第2期20-23,27,共5页 Journal of Hebei Institute of Architectural Science & Technology
关键词 输水隧洞 近接施工 既有桩基 有限元 water diversion tunnel close-space construction existing pile foundation finite element method
  • 相关文献

参考文献3

二级参考文献17

共引文献165

同被引文献3

  • 1丁军霞,冯卫星,张保俭.盾构隧道管片衬砌内力计算[J].石家庄铁道学院学报,2004,17(2):66-69. 被引量:11
  • 2朱伟.日本土木学会隧道标准规范(盾构篇)及解说[M].北京:中国建筑工业出版社,2001.38-74.
  • 3TB10003-2005.铁路隧道设计规范[S].[S].,..

引证文献1

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部