摘要
针对国家体育场现浇砼斜柱设计奇特,工程量大的特点,从设计参数出发,推导得出斜柱三维定位概括模型。总结施工过程中不同类型斜柱的测设方法,提出测设限差的确定原则。
Considering the fact of the typical design for gradient-pillar in national stadium, it presents the 3D position model based on the designed parameters. It summarizes the staking out methods of different types of pillar in construction. Finally, it indicates the principle of confirming the error limitations for the pillar staking out.
出处
《测绘工程》
CSCD
2006年第3期33-37,共5页
Engineering of Surveying and Mapping
关键词
奥运工程
国家体育场
斜柱
三维定位
施工测量
Olympic projects
national stadium
gradient-pillar
3D position
construction survey