摘要
介绍西门子Step7-400系统在柳钢8号高炉煤气余压透平发电装置(TRT)上的具体应用和取得的经验,包括控制系统的结构、程序设计思想和实现的功能简介。
The application and experience including control system configure, program design and function realization of Siemens Step7-400 system in the top gas pressure recovery turbine (TRT) of No.8 Blast Furnace have been introduced.
关键词
高炉煤气余压透平发电装置(TRT)
控制系统
转速
高炉炉顶压力
Top Gas Pressure Recovery Turbine (TRT) in Blast Furnace Control System Rotate Speed Roof Pressure of Blast Furnace