上海长峰商城逆作法施工中差异沉降的实测研究 被引量:10

Measurement Study of Differential Settlement During Reserved Construction in Changfeng Building of Shanghai
原文传递
导出
摘要 该文根据上海长峰商城特大型基坑逆作法施工中的实测资料,通过绘出立柱桩顶点在楼板各个施工阶段的等值线图,形象直观地反映基坑逆作法施工过程中立柱桩之间以及地下连续墙与相邻立柱桩差异沉降的变化情况,并对差异沉降进行分析和研究。 This paper is based on the measurement data of differential settlements, which are collected during reserved construction in Changfeng building of Shanghai. According to the settlement-contour maps of the floor supported by the top of soldier piles and continuous walls in each construction phase, the development of differential settlements between soldier piles and the development of differential settlements between diaphragm walls and adjacent soldier piles are directly reflected. Differential settlement is studied in this paper.
出处 《勘察科学技术》 2006年第3期11-14,共4页 Site Investigation Science and Technology
关键词 逆作法 差异沉降 沉降等值线图 reserved construction method differential settlement settlement-contour map
  • 相关文献

参考文献2

共引文献5

同被引文献16

引证文献10

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部