期刊文献+

大电力系统可靠性评估的系统状态抽取方法研究 被引量:25

Research on technique of system state selection for bulk power system reliability assessment
下载PDF
导出
摘要 大电力系统可靠性评估算法包括3个基本步骤:系统状态抽取、系统状态分析和系统可靠性指标的更新。其中系统状态抽取是大电力系统可靠性评估中的重要起始环节。详细讨论了大电力系统可靠性评估的4种系统状态抽取方法,即状态枚举、状态抽样、状态转移抽样和状态持续时间抽样的基本原理,分析了它们的优缺点,并用RBTS和IEEE-RTS79可靠性测试系统进行分析研究。研究结果表明,不同的系统状态抽取方法具有不同的适用范围,并对可靠性评估的计算效率有重要影响。 The algorithm of the bulk power system reliability assessment comprises three basic aspects: system state selection, system state analysis and updating of reliability indices. The system state selection is an important beginning part among these three aspects. This paper discussed in detail the basic principles of four kinds of system state selection methods, that is, state enumeration, state sampling, state transition sampling and state duration sampling. The RBTS and IEEE-RTS79 power systems were evaluated to demonstrate their advantages and disadvantages. The research results show that system state selection has significant impact on the calculation efficiency of reliability evaluation and different methods of system state selection have different application scope.
出处 《中国电力》 CSCD 北大核心 2006年第6期5-9,共5页 Electric Power
基金 国家自然科学基金资助项目(50307015) 中国博士后科学基金资助项目(2005037160)
关键词 大电力系统 可靠性评估 系统状态抽取 bulk power system reliability evaluation system state selection
  • 相关文献

参考文献17

  • 1BILLINTON R,LI W Y.Reliability assessment of electric power systems using Monte Carlo methods[M].New York:Plenum Press,1994.
  • 2赵渊,周家启,刘洋.发输电组合系统可靠性评估中的最优负荷削减模型分析[J].电网技术,2004,28(10):34-37. 被引量:57
  • 3赵渊,周家启.静止无功补偿器和移相器的最优配置及其对发输电系统可靠性的影响[J].电工技术学报,2004,19(1):55-60. 被引量:15
  • 4BILLINTON R,LI W Y.Hybrid approach for reliability evaluation of composite generation and transmission systems using Monte Carlo aimulation and enumeration technique[J].IEE Proceedings-C,1991,138(3):233-241.
  • 5BERTOLDI O,SALVADERI L,SCALCINO S.Monte Carlo approach in planning studies:an application to IEEE RTS[J].IEEE Transactions on Power Systems,1988,3 (3):1146-1150
  • 6别朝红,王锡凡.蒙特卡洛法在评估电力系统可靠性中的应用[J].电力系统自动化,1997,21(6):68-75. 被引量:170
  • 7KUMAMOTO H,TANAKA K,INOUE K,et al.State-transition Monte Carlo for evaluating large,repairable systems[J].IEEE Transactions on Reliability,1980,R-29(5):376-380.
  • 8BILLINTON R,LI W Y.A system state transition sampling method for composite system reliability evaluation[J].IEEE Transactions on Power Systems,1993,8 (3):761-767.
  • 9UBEDA J R,ALLAN R N.Reliability assessment of composite hydrothermal generation and transmission systems using sequential simulation[J].IEE Proc.-Gener.Transm.Distrib.,1994,141(4):257-262.
  • 10BILLINTON R,JONNAVITHULA A.Application of sequential Monte Carlo simulation to evaluation of distributions of composite system indices[J].IEE Proc.-Gener.Transm.Distrib.,1997,144 (2):87-90.

二级参考文献23

  • 1[1]Billinton R, Mahmud Fotuhi Firuzabad. Impact of unified power flow controllers on power system reliability. IEEE Transactions on Power Systems, 2000,15(1): 410~415
  • 2[2]Gyugyi L. Unified power-flow control concept for flexible AC transmission Systems. IEE Proceedings-C, 1992, 139(4): 323~331
  • 3[3]Paterni P,Vitet S. Optimal location of phase shifters in the french network by genetic algorithm. IEEE Transactions on Power Systems, 1999,14(1):37~42
  • 4[4]De oliveira E J, Marangon J W. Flexible AC transmission systems devices: Allocation and transmission pricing.Electrical Power and Energy Systems, 1999, 21(2):111~118
  • 5[5]Stephane Gerbex, Rachid Cherkaoui. Optimal location of multi-type FACTS devices in a power system by means of genetic algorithms. IEEE Transactions on Power Systems, 2001,16(3):537~544
  • 6[6]Singh S N, David A K. Optimal location of FACTS devices for congestion management. Electric Power Systems Research,2001,58:71~79
  • 7[7]Melo A C G, Pereira M V F, A M Leite da Silva. A conditional probability approach to the calculation of frequency and duration in composite reliability evaluation.IEEE Trans. on Power Systems, 1993,8 (3): 1118 ~ 1125
  • 8[8]Pereira M V F, Pintoand L M V G. A new computational tool for composite reliability evaluation. IEEE Trans.on Power Sytems,1992,7(1): 258~264
  • 9[9]Billinton R, Wenyuan L. Hybrid approach for reliability evaluation of composite generation and transmission systems using monte carlo simulation and enumeration technique. IEE Proceedings-C,1991,138(3)
  • 10[10]Billinton R, Kumar S, Chowdhury N et al. A reliability test system for Educational purposes-basic data. IEEE Trans. On Power Systems, 1994, 9(4): 1238~ 1244

共引文献231

同被引文献260

引证文献25

二级引证文献137

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;