摘要
苏通大桥南塔墩钢吊箱首次采用了现场整体拼装、计算机同步控制整体下放的先进工艺,本文重点论述了超大规模钢吊箱整体下放、吊点布置、结构处理、同步控制、导向定位等关键技术的研究和实施.
The South pylon steel cofferdam of Sutong Bridge firstly adopts the advanced techniques which are the spot holistically packing and the calculators synchronous-control for the holistically lowering. The key techniques and implements including the holistically lowering of the large steel cofferdam, the hanging point's arrangement, the structure processing, the synchronous control and the position etc are discussed.
出处
《华中科技大学学报(城市科学版)》
CAS
2006年第2期75-79,共5页
Journal of Huazhong University of Science and Technology
关键词
苏通大桥
南塔墩
钢吊箱
计算机控制
整体同步下放
Sutong bridge
south pylon
steel cofferdam
calculators synchronous-control
holistically-lowering