期刊文献+

嵌岩灌注桩初始后屈曲性状分析 被引量:1

Analysis of the Behavior of Initial Post-Buckling of Cast-in-situ Rock-Socketed Piles
下载PDF
导出
摘要 为了探讨桥梁工程中广泛使用的嵌岩灌注桩的初始后屈曲性状,先基于弹性地基梁理论假定桩身后屈曲分析模型与相应的桩身挠曲位移函数,由此建立桩土体系的总势能方程;然后采用扰动法,基于能量原理导得不同约束情况下桩顶临界荷载的变化式,并据此讨论了桩土刚度比、桩身埋置率及桩顶自由长度等对桩身后屈曲性状的影响规律.结果表明,当桩周土趋于软弱而桩身刚度越大时,桩身初始后屈曲平衡路径将越趋于不稳定,且可能因桩身初始缺陷的存在而导致其屈曲荷载的显著降低. To discuss the behavior of initial post-buckling of cast-in-situ rock-socketed piles widely used in bridge engineering, the total potential energy equation of the pile-soil system was first obtained from the simplified beam model on elastic foundation and oorresponding flexure function of the pile shaft. Then, variation forrnulas of the buckling load under different constrain conditions were deduced respectively by applying the minimum potential energy principle. Based on the obtained solutions, influencing rules by the stiffness ration of pile shaft to the surrounding soil, the embedded proportion of pile shaft and the length of unsupported part of pile top were discussed in detail. The result showed that, when the soil around the pile shaft was weaker or the pile shaft was stiffer, the initial post-buckling equilibrium path of pile shaft tended to be trustable, and a remarkable decrease of the critical load for piles with initial imperfections was possible, which couldn' t be neglected in engineering practice.
出处 《湖南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2006年第3期22-26,共5页 Journal of Hunan University:Natural Sciences
基金 国家自然科学基金资助项目(50378036) 教育部高等学校博士学科点专项基金资助项目(20020532008)
关键词 嵌岩灌注桩 初始后屈曲 扰动法 后屈曲平衡路径 临界荷载 cast-in-situ rock-socketed piles initial post-buckling perturbation approach post-buckling equilibrium path critical load
  • 相关文献

参考文献10

  • 1LEE K L.Buckling of partially embedded piles in sand[J].Journal of Soil Mechanics and Foundation Division,ASCE,1968,94(1):255-270.
  • 2SOVINC I.Buckling of piles with initial curvature[A].In:Proc.10th Int Conf on Soil Mech and Found.Engre[C],1981,(2):851-856.
  • 3REDDY A S,VALSANGKAR A J.Buckling of fully and partially embedded piles[J].Journal of Soil Mechanics and Foundation Divison,ASCE,1970,96(6):1951-1965.
  • 4胡人礼.关于桥梁基桩采用m法计算土壤抗力的几个问题.铁路标准设计通讯,1973,(1):18-26.
  • 5朱大同.端部嵌固桩的计算长度[J].铁路标准设计通讯,1974,(5):27-29.
  • 6赵明华.桥梁基桩稳定计算长度[J].工程力学,1987,4(1):94-105.
  • 7赵明华.桥梁桩基的屈曲分析及试验[J].中国公路学报,1990,3(4):47-56. 被引量:48
  • 8赵明华,王季柏.摩擦桩的屈曲分析[J].湖南大学学报(自然科学版),1995,22(6):109-114. 被引量:8
  • 9BUDKOWSKA B B,SZYMCZAK C.Partially embedded piles subjected to critical buckling load-sensitivity analysis[J].Computers & Structures,1996,61(1):193-196.
  • 10交通部科学研究院 河南省交通厅 吉林省交通厅.公路桥梁钻孔桩[M].北京:人民交通出版社,1978..

二级参考文献2

  • 1赵明华.桥梁桩基稳定计算长度[J]工程力学,1987(01).
  • 2赵明华.桥梁桩基稳定计算长度[J]工程力学,1987(01).

共引文献56

同被引文献4

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部