摘要
介绍了国内首套低压组合床重整装置的技术特点及装置运行情况,并针对影响装置运行的主要工艺参数进行了优化调整,探索出了一套行之有效的方法。
The technical characteristics and operational situations of the first low pressure integrated bed reforming unit in China are discussed in this paper,and an effective approach is obtained by optimizing and adjusting main process parameters that affecting the operation of the unit.
出处
《中外能源》
CAS
2006年第3期77-82,共6页
Sino-Global Energy
关键词
低压组合床
重整
运行
优化
low pressure integrated bed
reforming
operation
optimization integrated bed by optimizing and