摘要
针对龙滩工程对各环境因子复杂的影响需进行综合分析评价,以便了解工程兴建前后的环境总体情况,以及工程的可行性,并为选择工程方案提供科学依据。采用多级模糊综合评价法及灰色关联分析综合评价法对龙滩水电工程环境影响进行了分析后,认为工程兴建是可行的。
In the light of the complex impacts of various environmental factors on Longtan Hydropower Project, the comprehensive analysis and evaluation on the environmental impacts should be done in order to understand the general environment conditions before and after the construction of this project, to identify the project feasibility and to provide the scientific basis of selecting the projectproposals. The methods of multi-stage fuzzy comprehensive evaluation and grey association comprehensive analysis have been adopted in the environmental impact evaluation of Longtan Hydropower Project. After the evaluation, it is considered that the construction of this project is feasible.
出处
《水力发电》
北大核心
1996年第9期5-10,共6页
Water Power
关键词
水电站
环境影响评价
灰色分析法
Longtan Hydropower Project, environment impact, fuzzy evaluation method, grey analysis method