期刊文献+

龙滩水电工程环境影响综合评价方法研究 被引量:2

Study on comprehensive evaluation of environmental impacts on Longtan Hydropower project
下载PDF
导出
摘要 针对龙滩工程对各环境因子复杂的影响需进行综合分析评价,以便了解工程兴建前后的环境总体情况,以及工程的可行性,并为选择工程方案提供科学依据。采用多级模糊综合评价法及灰色关联分析综合评价法对龙滩水电工程环境影响进行了分析后,认为工程兴建是可行的。 In the light of the complex impacts of various environmental factors on Longtan Hydropower Project, the comprehensive analysis and evaluation on the environmental impacts should be done in order to understand the general environment conditions before and after the construction of this project, to identify the project feasibility and to provide the scientific basis of selecting the projectproposals. The methods of multi-stage fuzzy comprehensive evaluation and grey association comprehensive analysis have been adopted in the environmental impact evaluation of Longtan Hydropower Project. After the evaluation, it is considered that the construction of this project is feasible.
出处 《水力发电》 北大核心 1996年第9期5-10,共6页 Water Power
关键词 水电站 环境影响评价 灰色分析法 Longtan Hydropower Project, environment impact, fuzzy evaluation method, grey analysis method
  • 相关文献

同被引文献21

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部