期刊文献+

广州抽水蓄能电站地下厂房开挖的有限元分析 被引量:1

FEM Analyses of underground Excavation for Guangzhou Pumped-storage Power Station
下载PDF
导出
摘要 本文根据实测地应力值回归获得的地下厂房区大范围的地应力场,分析了广州抽水蓄能电站地下厂房开挖时的围岩应力场及位移场,并对洞室围岩稳定性进行了评价。它是根据“广州抽水蓄能电站厂房区地应力测定及分析”一文(见《长江科学院院报》1988年第4期)提供的方法,在工程上的具体应用。 Measurement and analyses of ground stress by Finite Element Method was recently described for studying the underground excavation in the Guangzhou Pumped-storage Power Station (Gong Bixin et al, Journal of YRSRI, No. 4, 1988). In order to apply these results to actual engineering, this paper further analyzes the stress and displacement fields of the adjoining rock when excavating underground powerhouse in accordance with additional measued values of ground stress and evaluation is made on stability of adjoining rock for cavity.
出处 《长江科学院院报》 CSCD 北大核心 1990年第3期36-44,共9页 Journal of Changjiang River Scientific Research Institute
关键词 抽水蓄能 水电站 地下 厂房 开挖 pumped-storage, underground power-house, stress field, displacement field, measurement, analyses
  • 相关文献

参考文献2

二级参考文献1

共引文献12

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部