摘要
对既有线车站改造工程中,由站场变化引起新增或移设道岔,将道岔表示纳入车站联锁的实施技术方案归纳分析,提出个人观点与看法。
Author's view point and opinion is given in the paper on summary and analysis of implementation scheme for bringing along switch indication into station interlocking in case that switches are increased or displaced due to station changes during station reconstruction projects on existing lines.
出处
《铁路通信信号工程技术》
2006年第3期17-19,27,共4页
Railway Signalling & Communication Engineering