摘要
以某座双塔双索面三跨预应力混凝土梁与钢桁叠合梁斜拉桥为例,对影响双线铁路主跨280m叠合梁斜拉桥竖向刚度的各项因素进行了分析比较。
The paper takes a cable-stayed bridge with couple tower, couple cable, three-span prestressed concrete beam and steel truss composite beam for example, analyzes and compares various factors that affect the vertical rigidity of composite beam cable-stayed bridge of double line railway.
出处
《西部探矿工程》
CAS
2006年第B06期395-396,共2页
West-China Exploration Engineering
关键词
双线铁路
叠合梁
斜拉桥
竖向刚度
double line railway
composite beam
cable-stayed bridge
vertical rigidity