二滩拱坝初次蓄水的变位监测反分析 被引量:5

Back Analysis of Displacement Monitoring Results During Ertan Arch Dam Fist Impoundment
下载PDF
导出
摘要 简要介绍了在二滩拱坝1998年5月初次蓄水期,通过拱坝垂线和监测网系统,用统计模型和确定性模型理论分析方法,建立了施加于坝体各作用量与坝体受作用后的效应量(变位)间的数学关系;并根据预先计算分析成果,提出了在初次蓄水运行中拱坝变位的参考预报值,实时对二滩拱坝实际工作状态作出安全评判。 This paper presents that during the first impoundment of Ertan reservoir in May 1998, mathematic relationship between the loads acting on the dam & the respondent displacements was established by use of statistic model & determined model theoretic analysis method based on the observation results of the plumblines installed in the dam & monitoring network surveying results. Based on previous calculation & analyis results the dam displacement predictive values during the fist impoundment operation were given & Ertam arch dam actual operation was judged safe.
作者 舒涌
出处 《水电站设计》 2006年第2期34-41,共8页 Design of Hydroelectric Power Station
关键词 初次蓄水期 拱坝 安全监测 反分析 变位 二滩水电站 the first impoundment arch dam safety monitoring back analysis displacement Ertan Hydropower Station
  • 相关文献

同被引文献53

引证文献5

二级引证文献38

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部