摘要 对某千米级斜拉桥的施工加载过程进行了分析,结合有限元步进法、一阶分析法和按龄期调整的有效模量法,编制了相应的计算程序.根据该桥实际划分的施工时段,计算桥梁从施工到成桥任一时刻主梁和主塔受力和变形状态,并提出了建议. The cantilever construction process of a thousand-meter scale cable-stayed bridge is investigated. According to the step by step finite element method, first order optimization method and the age adjusted effective modulus method, a computing program is presented in this paper. Based on actual dividing constructed stages of this bridge, Stress and deformation of girders and cable tower at any period of time during the whole construction course are analyzed. Some of useful comments are presented.
出处 《广州大学学报(自然科学版)》 CAS 2006年第3期54-59,共6页 Journal of Guangzhou University:Natural Science Edition
基金 中国博士后科学基金资助项目(2003034279)
关键词 斜拉桥 施工控制 仿真计算 cable-stayed bridge construction proposals control computing emulation
  • 相关文献

参考文献4

二级参考文献11

共引文献51

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部