期刊文献+

骨干淤地坝等库容分期加高的研究 被引量:2

Study on Increasing Height of Main Silt-arrester by Stages with Equal Storage
下载PDF
导出
摘要 骨干淤地坝等库容分期加高的研究武永昌,朱首军,张胜利(西北林学院,陕西省杨陵镇712100)StudyonIncreasingHeightofMainSilt-arresterbyStageswithEqualStorage¥WuYongchang;... The ways of increasing height.of silt-arrester by stages include that with equal storage,equal height and that without restraint. The way of increasing height of silt-arrester by stages with equal storage can save project investment.On the bsais of data from Hongyagou silt-arresters in Hengshan County of Shaanxi Province, the optimum number of increasing height with equal storage is 3 or 4,the corresponding initial storage is the premium storage.Each hightening should conduct at the time when the surplus storage without alluvion equals to designed flood detention storage.
机构地区 西北林学院
出处 《中国水土保持》 北大核心 1996年第8期17-20,46,共5页 Soil and Water Conservation in China
关键词 淤地坝 库容 分期加高 main silt-arrester increasing height by stages with equal storage hightening by stages
  • 相关文献

同被引文献3

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部