摘要
根据流体机械多相流动试验台管路系统存在的问题,对管路系统存在的问题作了若干改进,明显地减小了水头损失,提高了试验台设计参数。
The existent problems have been improved for the pipe system of multiphase flow test stand. The waterpower loss has obviously been decreased. The planning parameter of the test stand has been increased.
出处
《机械制造与自动化》
2006年第3期41-42,44,共3页
Machine Building & Automation