通过乐滩水电站工程规模论证,简述该工程正常蓄水位选择和装机容量选择设计阶段方案技术经济比较的主要成果、取舍方案的主要因素、以及项目建议书评估会专家组的评估意见;并根据乐滩水电站工程规模设计论证总结类似工程规模论证时的主要技术要点。
Based on the project scale argumentation of Letan hydropower station, the paper briefly introduces the main results of scheme' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of Letan hydropower station.
出处
《红水河》
2006年第2期31-34,共4页
Hongshui River
关键词
工程规模论证
动能参数选择
正常蓄水位
装机容量
电力系统
乐滩水电站
project scale argumentation
kinetic energy parameter option
normal storage water level
installed capacity
power system
Letan hydropower station