摘要
介绍了运用非线性编辑系统制作水电站工程专题片的基本步骤和需要注意的问题,以及非线性编辑技术的发展趋势。
It describes the basic steps to make special project films with the non-linear editing system and issues to be noted as well as the trend in development of non-linear editing technique.
出处
《西北水电》
2006年第2期64-67,共4页
Northwest Hydropower