摘要
阐述了500 kV罗平至百色紧凑型线路工程施工和监理过程中,电气距离控制、滑车安装、导线缠绕打绞、弧垂施工、相间间隔棒安装、金具更换等技术问题及采取的有效控制措施和处理方法.
The paper describes the quality control measurements and solutions for electrical distance control, installation of the pulley, conductor twisting, sag control, installation of the spacers fittings and other issues during the erection installation and supervision of the 500 kV compact type transmission line from Luoping to Baise.
出处
《长沙电力学院学报(自然科学版)》
2006年第2期27-31,共5页
JOurnal of Changsha University of electric Power:Natural Science
关键词
500
kV紧凑型线路
架线施工
技术问题
500 kV compact type transmission line
erection of over head transmission line
technical issues