摘要
结合工程实例,分析了在河床没有覆盖层的情况下深水基础的经济施工方案,介绍了筑岛结合钢板桩围堰的施工方法及工艺,有效地保证了工期目标的实现,同时取得了较好的经济效益。
Combine with the case study, analyze economic construction scheme of deepwater foundation in the condition of having no overlying stratum. Introduce the construction scheme steel sheet pile combining with island, ensure the goal of the construction come true on schedule, and get preferable economy benefit.
出处
《山西建筑》
2006年第13期87-88,共2页
Shanxi Architecture
关键词
钢板桩围堰
摩擦力
施工方法
工艺流程
steel sheet pile cofferdam, frictional force, construction ways, technological process