摘要
虎山坡防冲墙水下砼施工中,通过认真研究和比较砼配合比,并在设计、监理及建设方工程技术人员的指导下进行施工,因此,这次防冲墙砼的施工质量达到了设计及规程规范要求。
In the erosion-control wall's underwater concrete construction of Hushan brae treatment project, the forming proportion has been studied and compared seriously. The project constructed under the guidance of technologist from design, supervision and the construction party, therefore the castruction quality of the erosioncontrol wall reaches the design and regulation requirement.
出处
《青海电力》
2006年第2期8-10,14,共4页
Qinghai Electric Power
关键词
虎山坡治理工程
防冲墙
水下砼
施工
Hushan brae treatment project
erosion-control wall
underwater concrete
construction