Study on high rock slop anchoring technique of large rock engineering

Study on high rock slop anchoring technique of large rock engineering
下载PDF
导出
摘要 Monitoring data from the Three Gorges Project show that the resulted tensile stresses are mainly distributed within the front section of the internal anchoring section which is often measuring 2.5 m in length. The composition of two early strength cement grout mixes marked as R_3350 and R_7350 was successfully developed to accelerate anchoring facilities installation and to reduce its intervention with the shiplock construction. It was measured that the ground water pH value in the sidewall slopes of the permanent navigation shiplock during the construction period was close to 8. Based on those characteristics it is concluded that the groundwater is weakly corrosive to steel material and will appear as non-corrosive to the steel wire strands embedded in the cement grout set. The advanced model of 3 MN unbonded anchor cables with double anti-corrosion protection(including the corrugated pipe) is developed to meet the needs of stabilizing the high sidewall rock slopes of the permanent navigation shiplock on the Three Gorges Project. Monitoring data from the Three Gorges Project show that the resulted tensile stresses are mainly distributed within the front section of the internal anchoring section which is often measuring 2.5 m in length. The composition of two early strength cement grout mixes marked as R3350 and R7350 was successfully developed to accelerate anchoring facilities installation and to reduce its intervention with the shiplock construction. It was measured that the ground water pH value in the sidewall slopes of the permanent navigation shiplock during the construction period was close to 8. Based on those characteristics it is concluded that the groundwater is weakly corrosive to steel material and will appear as non-corrosive to the steel wire strands embedded in the cement grout set. The advanced model of 3 MN unbonded anchor cables with double anti-corrosion protection (including the corrugated pipe) is developed to meet the needs of stabilizing the high sidewall rock slopes of the permanent navigation shiplock on the Three Gorges Project.
出处 《Journal of Coal Science & Engineering(China)》 2006年第1期16-20,共5页 煤炭学报(英文版)
关键词 巨岩工程 加固技术 监测数据 高岩边坡 high rock slope, anchoring technique, large rock engineering
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部