摘要
根据中国石油辽河油田公司和辽河石油勘探局进军海上的石油开发战略部署,实现海南8块石油开发计划,铺设了第1条海底管道。本文重点介绍了辽河滩海海域海底管道建设中采用的新工艺和新技术,同时对整个建设过程进行了经验总结,并提出了在辽河滩海地区海底管道施工工艺技术方面有待解决的相关问题,为未来滩海石油开发工程建设奠定了基础。
A subsea pipeline has been laid in Block Hainan 8 according to the development plan made by Liaohe Oil Company and Liaohe Petroleum Exploration Bureau,PetroChina.This paper addresses the new process and technology used in subsea pipeline construction in Liaohe tidal zone,summarizes the experience gained during the whole construction process,and proposes relative technical problems to be solved.This has laid foundation for tidal zone oil development in the future.