摘要
就城镇污水处理厂工程BOT及其配套管网工程BOT/BT的建设模式进行实际案例分析和讨论,通过不同组合模式的分析和比较,陈述不同组合模式的优缺点。
Analyses and discussions on the actual cases are conducted to the construction mode of BOT model for municipal wastewater treatment projects and the BOT/BT model for their counterpart collectors projects. The advantages and disadvantages of different combined models are described by comparing different combined models of construction wastewater treatment plant.
出处
《工业安全与环保》
2006年第7期21-23,共3页
Industrial Safety and Environmental Protection