以大别山隧道1号斜井为例,介绍了施工机械设备的配置原则、配置方案,阐述了机械设备的选型及配套,分析了施工效果,总结了机械设备的配置经验。
Taking 1# inclined shaft work of Dabieshan tunnel as example the principle and scheme for the configuration of construction ma- chinery are introduced as well as type selection and mating. Construction effect is analyzed. In the end experiences are summarized.
出处
《山西建筑》
2006年第14期281-282,共2页
Shanxi Architecture
关键词
施工机械
配套设备
掘进作业线
construction machinery, necessary equipment, tunneling operation line