简述了先简支后连续梁桥的施工优点,从旧混凝土凿毛、底模及支座的安装、钢筋安装、混凝土养生等方面介绍了湿接缝的施工技术,总结了施工过程中疑难问题的解决措施。
It illustrates the construction advantages of simple-supported-to-continuous beam bridge, introduces wet joint construction technique from chiseling old concrete, installing soffit forrnwork and bearing, installing steel bar and concrete curing, and summarizes salvation of difficulties in construction process.
出处
《山西建筑》
2006年第14期318-319,共2页
Shanxi Architecture
关键词
连续梁桥
筒支梁桥
湿接缝施工
continuous beam bridge, simple-supported beam bridge, wet joint construction