摘要
结合广州富力桃园A8-A11高层住宅楼的工程概况,介绍了预应力管桩的应用技术及质量保证措施,探讨了冲孔灌注桩的设计,提出了预应力管桩单桩竖向承载力及冲孔灌注桩终孔标高的确定方法。
Combined with general construction condition of Guangzhou Fulitaoyuan AS-All high-rise residential buildings, it introduces the application technique and quality assurance measures of pre-stressed pipe pile, discusses the design of boring cast-in-situ pile, and proposes the way to determine single pile vertical bearing capacity of pre-stressed pipe pile and the final-hole's height of boring cast-in-situ pile.
出处
《山西建筑》
2006年第14期105-106,共2页
Shanxi Architecture
关键词
预应力管桩
冲孔灌注桩
竖向承载力
pre-stressed pipe pile, boring cast-in-situ pile, vertical bearing capacity