介绍了邯钢7#热风炉改造充分利用老基础扩大底面积提高承载力的施工方法。
The constructing method to fully use the old base to expand the base area to raise the bearing capacity in reforming of No.7 Hot Blast Stove of Handan Iron and Steel General Plant is introduced.
出处
《河北冶金》
1996年第5期53-55,共3页
Hebei Metallurgy