摘要
阐述了填石路堤在高等级公路应用中的过程控制,针对石方路堤施工特点,通过铺筑实验段取得了合适的施工工艺、松铺厚度、碾压遍数、压实干密度等方案参数,提出了填石路基需要注意的问题。
This paper expounds the process control of the road bank in the application in the high-level highways, and in the light of the features of the construction of the stone road bank, obtains some suitable scheme parameters through the paving and constructing tests such as the construction techniques, loose paving thickness, rolling times, and compacted dry density, etc., and puts forward some problems needing attention in the construction of the rock-fill road bed.
出处
《科技情报开发与经济》
2006年第12期267-269,共3页
Sci-Tech Information Development & Economy
关键词
填石路堤
高等级公路
过程控制
rock-fill road bank
high-level highway
process control