东海大桥跨海段非通航孔桥墩承台施工 被引量:4

Construction of Footings at Non-navigable Spans of the East Sea Bridge
下载PDF
导出
摘要 采取何种高效、优质、安全的施工方法完成跨海段非通航孔桥墩承台施工是东海大桥工程建设能否取得成功的关键之一。主要介绍东海大桥跨海段非通航孔桥墩承台施工总原则以及施工方案的比选。详细介绍了选定的带钢底板的混凝土套箱工艺进行承台施工的技术线路、受力分析以及关键工艺和特殊措施等。工程中采取的一系列新技术和工艺创新为外海工程提供了成功的经验。 An efficient, excellent and safe way to complete the construction of pier footings at the non-navigable spans over the sea is one of the key points for the success of the East Sea Bridge Project. Introduced here are the general principles and program for the construction of footings, including details of the steel-slab-bottomed concrete casing, force analysis and key steps and special measures of the workmanship. A series of new techniques and innovation adopted in the project will provide successful experience in execution of off-sea projects.
机构地区 第三航务工程局
出处 《中国市政工程》 2006年第3期24-27,共4页 China Municipal Engineering
关键词 跨海大桥桥墩 非通航孔 承台施工 bridge pier over the sea non-navigable span construction of footings
  • 相关文献

同被引文献12

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部