阐述了建设工程工程量定额计价模式与清单计价模式的基本概念与特点,提出了提供正确的工程量清单、严格审查施工单位索赔要求、注意综合单价调整范围等建设单位适应定额计价模式向清单计价模式转变应做好的几项工作。
Expounds the basic concepts and characteristics of quota valuation mode and list valuation mode for the engineering amount of the construction project. Several tasks should be done for the construction unit to adapt to the transition from quota valuation mode to list valuation mode: providing the exact list of the engineering amount, strictly examining the claim for compensation by the unit undertaking the construction, and paying attention to the adjusting range of the integrated unit price.
出处
《西安石油大学学报(社会科学版)》
2006年第3期52-54,58,共4页
Journal of Xi’an Shiyou University:Social Science Edition
关键词
建设工程
定额计价
清单计价
construction project
quota valuation
list valuation