摘要
通过对某大型工业水池伸缩缝间距与极限抗拉强度验算,并对构造配筋、混凝土配合比等控裂防渗技术进行优化,成功实施了70m超长池体整体无缝(带)浇筑,实现了大型水池混凝土结构自防水无裂渗的目标。
By means of checking calculation about expansion joint spacing and ultimate tensile strength for a large water pond as well as optimization of constructional reinforcement and concrete mix, a 70 m long monolithic concrete water pond was successfully constructed, attaining the goal of structurally self waterproofing.
出处
《中国建筑防水》
2006年第7期23-27,共5页
China Building Waterproofing
关键词
大型工业水池
无缝(带)整浇
控裂防渗
large water pond
seamless pouring
leak preventionby controlling cracking