三峡工程建设综述 被引量:1

Summarization of Three-Gorge Project
下载PDF
导出
摘要 三峡工程建设由枢纽工程、移民安置工作、输变电工程3大部分组成,其主要功能为防洪、发电、航运。文章简要介绍了三峡工程的基本概况及其近况,对世人关注的三峡工程建设中科技创新、工程质量、机电设备国产化情况等问题进行了重点介绍。 Three- Gorge Project Construction is composed of the hub project, immigrant scttlement, and power transmission and transformation project, their major function is to prevent flood, generate electricity, and shipphg. The paper briefly introduced the basic general situation of Three - Gorge Project and its recent developments. The conditions of the innovation of science and technology, project quality and the localization of electromecharucal equipment in Three - Gorge Project Construction were emphatically introduced.
作者 李秦
出处 《电力设备》 2006年第7期4-8,共5页 Electrical Equipment
关键词 三峡工程 输变电工程 机电设备 国产化 Three- Gorge Project power transmission and transformation project electromechanical equipment localization