盘山电厂600MW机组主蒸汽压力控制分析 被引量:2

Analysis of Main Steam Pressure Control of 600 MW Generating Unit in Panshan Power Plant
下载PDF
导出
摘要 分析了盘山电厂600MW机组协调系统原设计与改造后的主蒸汽压力控制,着重介绍了炉跟机协调中的功率指令前馈。协调系统改造以后,机组的负荷控制及主蒸汽压力控制的稳定性都有所改善。文章还提出了在分散控制系统(DCS)中引进先进算法(如自适应和预估控制等)的建议。 This paper analyses the main steam pressure control of the design,original and after the retrofitting ,of coordinated control system for 600 MW generating unit in panshan Power Plant, emphatically briefs the power command fecdforward in the coordination of boiler following turbine.After the retrofitting of coordinated system, the stabilities of both the bad control and main steam pressure control of the unit have been improved.The paper also puts forward the proposal: to introduce the advanced algorithm method (such as selfadaption and predicting control etc.)in the distributed control system (DCS).
出处 《电力设备》 2006年第7期53-55,共3页 Electrical Equipment
关键词 主蒸汽压力控制 协调控制系统 功率指令前馈 火力发电厂 main steam pressure control coordinated control system,power command feedforward power plant
  • 相关文献

同被引文献17

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部