期刊文献+

120m跨度干煤棚网壳累积滑移法施工技术 被引量:6

CONSTRUCTION TECHNOLOGY OF CUMULATIVE SLIP METHOD FOR LATTICED SHELL OF INDOOR COAL STORAGE YARD
下载PDF
导出
摘要 华能北京热电厂干煤棚采用螺栓球节点三心圆柱面网壳结构。网壳平面尺寸为120m×210m,跨度为120m,网壳顶标高为43.75m,网壳厚3.8m。这在目前国内同类结构中属最大跨度的网壳工程。为了不影响原有发电厂的正常工作并考虑降低工程造价,经多方论证,采用了一种先进的网壳施工方法———网壳累积滑移法。详细介绍了累积滑移的施工方法、滑移的施工验算及滑移节点构造等。 A three-column latticed shell of bolt spheric joints was used for the indoor coal storage yard of Huaneng Beijing Thermal Power Plant. The plane size, span, top elevation and thickness of the latticed shell were 120 m×210 m, 120 m,43.75 m and 3.8 m, respectively. It was demonstrated that an advanced construction method cumulative slip method of the shell was adopted. It was described in detail that construction method of cumulative slip, checkup of slip construction, and structure of slip joints etc.
出处 《钢结构》 2006年第3期6-9,共4页 Steel Construction
关键词 三心圆柱面网壳 网壳累积滑移法 滑移节点构造 滑移施工过程验算 three-column latticed shell cumulative slip method of latticed shell configuration of slip jointcheckup of slip construction process
  • 相关文献

参考文献5

  • 1JGJ-91 网架结构设计与施工规程
  • 2JGJ 61-2003 网壳结构设计与施工规程
  • 3中国钢结构协会.建筑钢结构施工手册[M].北京:中国计划出版社,2002..
  • 4GB50017-2003.钢结构设计规范.[S].中华人民共和国建设部,..
  • 5GB50205-2001.钢结构工程施工质量验收规范.[S].中华人民共和国建设部,..

共引文献393

同被引文献39

引证文献6

二级引证文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部