对直接与压力管道相连的给水泵站,运用能源单耗概念进行运营管理评价并不适用。笔者将某泵站的实际运行数据进行对比分析后,提出了利用吨水耗电量、出水流量、泵站效率等指标进行运营评价的方法,供同行参考。
Unit energy consumption is not suitable for the operation estimate of water supply pump station connected with pressurized pipes directly. After comparison and analysis of the practical operation data of a pump station, the paper puts forward an operation estimate method using the parameters of electricity consumption per ton water supply, outlet water flowrate and pump efficiency, etc., to provide a reference for similar pump stations.
出处
《中国给水排水》
CAS
CSCD
北大核心
2006年第14期86-88,共3页
China Water & Wastewater
关键词
给水泵站
压力管道
能源单耗
耗电量
流量
效率
water supply pump station
pressurized pipe
unit energy consumption
electricity consumption
flowrate
efficiency