矮寨悬索桥初步方案研究 被引量:6

Research on Preliminary Plan for Aizhai Suspension Bridge
下载PDF
导出
摘要 矮寨特大桥为吉茶高速公路的控制性工程。桥位距吉首市区约20 km,跨越德夯大峡谷。桥位紧邻德夯苗族文化风景区,自然环境优美,地形条件复杂,桥面设计标高与地面高差达330 m左右,山谷两侧悬崖距离从900 m到1 300 m之间变化。推荐方案为262 m+1 146 m+124 m的钢桁加劲梁单跨悬索桥,桥梁两端直接与隧道相连,锚碇分别采用重力式锚碇和隧道式锚碇。介绍了大桥方案设计、抗风及岩石力学研究的阶段成果。 The Aizhai Extra-large Bridge is a controlling project on Jishou to Chadong Expressway. The bridge site, overpassing Dehang Canyon, is about 20 kilometers away from Jishou City. The bridge site is close to Dehang Miao People's Cultural Scenic Spot, which has beautiful natural environment and complicated topographical conditions. The difference is up to 330 m between the designed elevation of bridge floor and the ground surface elevation. The distance between cliffs on both sides of Canyon varies from 900 m to 1 300 m. The recommended scheme is 262 m + 1 146 m + 124 m steel truss stiffened beam single-span suspension bridge. The ends of the bridge are connected to the tunnel. The anchorage is separately adopted gravity anchorage and tunnel-type anchorage. This paper introduces the bridge plan design and the periodical achievements of wind-resistant and rock mechanics research.
作者 廖建宏
出处 《中南公路工程》 2006年第3期94-97,共4页 Central South Highway Engineering
基金 湖南省交通厅科技项目(200517)
关键词 桥梁工程 方案 研究 bridge engineering plan research
  • 相关文献

参考文献3

  • 1JTGD60-2004.公路桥涵设计通用规范[S].[S].,..
  • 2陈政清.吉茶高速公路矮寨大桥悬索桥抗风与抗震初步设计阶段研究报告[D].湖南大学,2005.
  • 3丁秀丽.长沙至重庆国道主干线矮寨悬索桥初设阶段隧道锚碇与塔基岩体稳定性分析[D].长江水利委员会长江科学院,2005.

共引文献1582

同被引文献34

引证文献6

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部