摘要
苏州市石湖大桥为无背索钢斜拉桥,介绍其主梁、主塔和斜拉索的施工方法。
The Shihu Lake Bridge in Suzhou City is a steel cable-stayed bridge without backstays. In this paper, the construction methods for the main girder, pylon and stay cables of the Bridge are presented.
出处
《桥梁建设》
EI
CSCD
北大核心
2005年第B06期85-88,共4页
Bridge Construction
关键词
斜拉桥
主梁
主塔
斜拉索
施工方法
cable-stayed bridge
main girder
pylon
stay cable
construction method